In this week's meeting, the small scale sub-teams worked together to lower the total cost of its Bill of Materials. The small scale track and manufacturing team re-checked the inventory to find usable parts, but no significant stock could be found.
Overall, the team was able to lower cost by about $1500+. The next step for my team is to begin ordering the necessary parts for rapid typing the switch section of our design. In the meantime, we will be using plywood available in the warehouse to construct this switch section.
Subscribe to:
Post Comments (Atom)
Spring 2018, Week 15: Completing the Final Presentation
May 9, 2018 On Wednesday, we came into the SSDC to adjust any sections that would cause the bogie to bind. We re-bent a curve section, as ...
-
April 11, 2018 This week, our team presented our second presentation of the semester. In this presentation, I reiterated the design r...
-
May 9, 2018 On Wednesday, we came into the SSDC to adjust any sections that would cause the bogie to bind. We re-bent a curve section, as ...
-
March 21, 2018 This week, our team attempted to create curve sections with the bender Kevin manufactured. As shown Figure 1, it seems that...
No comments:
Post a Comment