April 18, 2018
This week, our team continued to work our way towards manufacturing the track. We ran into some issues with the mounting sleeves that Bryan was welding because the metal burrs were preventing the sleeves from sliding onto the L-shape square tubing. Thus, Bryan utilized the class period to shave them down.
Meanwhile, my workload slowed down this week because our team ran out of brackets to assemble the straights. With the mounting brackets and the 3-D printed brackets incomplete, our manufacturing has stalled slightly. However, I am still confident that my team will complete this in the coming weeks.
Subscribe to:
Post Comments (Atom)
Spring 2018, Week 15: Completing the Final Presentation
May 9, 2018 On Wednesday, we came into the SSDC to adjust any sections that would cause the bogie to bind. We re-bent a curve section, as ...
-
April 25, 2018 This week, the team continued to manufacture the track. With the mounting sleeves deburred, our team can finally start asse...
-
April 11, 2018 This week, our team presented our second presentation of the semester. In this presentation, I reiterated the design r...
-
After completing Presentation 1 of the semester last week, the 1/12 scale team continued further design work for the new track. To tackle th...
No comments:
Post a Comment