This week, our team continued to work our way towards manufacturing the track. We ran into some issues with the mounting sleeves that Bryan was welding because the metal burrs were preventing the sleeves from sliding onto the L-shape square tubing. Thus, Bryan utilized the class period to shave them down.
Meanwhile, my workload slowed down this week because our team ran out of brackets to assemble the straights. With the mounting brackets and the 3-D printed brackets incomplete, our manufacturing has stalled slightly. However, I am still confident that my team will complete this in the coming weeks.
Subscribe to:
Post Comments (Atom)
Spring 2018, Week 15: Completing the Final Presentation
May 9, 2018 On Wednesday, we came into the SSDC to adjust any sections that would cause the bogie to bind. We re-bent a curve section, as ...
-
May 9, 2018 On Wednesday, we came into the SSDC to adjust any sections that would cause the bogie to bind. We re-bent a curve section, as ...
-
May 2, 2018 Throughout the week, our team managed to complete all the sections of the track. Early in the week, I managed to assemble the ...
-
March 21, 2018 This week, our team attempted to create curve sections with the bender Kevin manufactured. As shown Figure 1, it seems that...